Loading...
Dredging Fleet
Hopper dredger "Belomorskiy", project 469
Vessel SCHEME
SPECIFICATIONS
| Technical Indicator | Data |
| Russian Register class | KM ⍟ L1 hoper dredger |
| Ice class | IA |
| Year built, Builder | 1985, Split |
| Length overall | 80,49 m |
| Beam | 15,10 m |
| Depth | 5,60 m |
| Max Draught at dredging work (Loaded) | 5,2 m |
| Light draft bow | 2,24 m |
| Light draft aft | 3,48 m |
| Deadweight summer | 2044 t |
| Gross tonnage | 2628 rt |
| Net tonnage | 788 rt |
| Hopper capacity (full loaded) | 1304 cbm |
| Hopper capacity (up to low level overflow) | 750 cbm |
| Suction pipe diameter | 600 mm |
| Discharge pipeline diameter | 600 mm |
| Dredging pump (number and ouput, h.p./kw) | 2 * 340/250 |
| Dredging capacity (max) * | 1000 cbm per hour * |
| Pumping capacity for deposition of pulp through the sludge line ** | 700 cbm per hour ** |
| Max Dredging depth | 25 m |
| Min Dredging depth | 5,5 m |
| Min required Length of dredging area | 500 m |
| Min required area for one hundred eighty degrees turn | 140 m |
| Speed loaded | 9,0 knots |
| Speed in ballast | 10,0 knots |
| Main engines | MAN&BV 6S28 LU-4 |
| Number x output | 2 * 1510 h.p. |
| Recommended Oil | MDO Dist DMB (ISO 8217/1996) |
| Fuel consumption (daily): | |
| Sailing | 9 t |
| Dredging | 7,78 t |
| Deposition through the sludge line | 7,78 t |
| Stoppage during dredging job | 1,49 t |
| Idle staying | 0,827 t |
| Bunker capacity | 390 t |
| Fresh water capacity | 120 t |
| Bow thruster | 350 h.p. |
| Crew | 20 persons |
| Endurance of TSHD | 30 days |
| Remarks : * Dredging capacity depends on type of soil to be dredged. ** Pumping capacity for deposition of pulp through the sludge line depends on length of line as well as of height of stack place. |
|